Drayton Harbor Hills: Third Party Review, Blaine, WA
Click on each image below to enlarge.
Merit Engineering has has furnished the City of Blaine Public Works Department with third
party review services during the development of Drayton Hillside above Drayton Harbor. The project area consisted
of approximately 25 acres divided in to 24 lots located on the Drayton Hillside overlooking Drayton Harbor.
The main concern on this project was soil erosion control, slope stability, and stormwater best
management practices during site work on road and utility installations. The site work was limited to the upper
portion of the hillside. Erosion control blankets consisting of hay held together by geo-fabric nets were installed
on the face of cut and grass seeds were planted on the cut. Surface water was collected in two temporary ponds
allowing for settlement of fine soils. The water was further directed downhill into two steel Baker Tanks for
further sedimentation to occur. The water from the Baker Tanks then flowed through a bioswale system into a ditch
entering the bay.
Go Back
|